Galvanized steel plate water tank
Galvanized steel plate water tank
Galvanized steel plate water tank
+
  • Galvanized steel plate water tank
  • Galvanized steel plate water tank
  • Galvanized steel plate water tank

Galvanized steel plate water tank

Our company produces galvanized steel plate water tanks using different plate materials, formed into different unit panels (1×1m, 1×0.5m, 0.5×0.5m) by a 500T hydraulic press. These panels are connected with bolts and sealing strips to form water tanks of different specifications and forms.

Keyword:

Galvanized steel plate water tank

Product Description

Product Introduction

Our company produces galvanized steel plate water tanks using different plates, formed into different unit panels (1×1m, 1×0.5m, 0.5×0.5m) by a 500T hydraulic press, and connected with bolts and sealing strips to form water tanks of different specifications and forms.

The water tank has advantages such as convenient and flexible on-site assembly,不易变形, strong seismic resistance, corrosion resistance, easy cleaning and long service life.

The water tank can store both cold and hot water, and is acid-resistant, alkali-resistant, non-permeable, non-leaking, and non-deformable.

Selection Instructions

1. When ordering, the Size, pipe connection position, and pipe diameter should be provided.
2. The water storage temperature should preferably be 4~80℃. If the water storage temperature is higher than this value, it can be proposed during ordering, and a separate solution will be provided.
3. The load of the water tank on the ground should be determined by the structural designers.
4. If the water tank pipe connection position provided by the user is exactly at the plate seam, our company needs to adjust it, the pipe diameter remains unchanged (the user will not be notified separately).

Installation and Acceptance

1. During installation, a maintenance passage of not less than 700 mm should be left between the tank body and the wall. The top and bottom of the tank should be not less than 500 mm.
2. During civil construction, prepare the supports first, and the edge seams between the water tank sides and the bottom unit panels should be located on the supports.
3. After assembly, close the water supply and drain pipes, open the water inlet pipe, and check while releasing water until the tank is full. No leakage within twenty-four hours is considered qualified.

  • 产品描述
    • Commodity name: Galvanized steel plate water tank

    Our company produces galvanized steel plate water tanks using different plate materials, formed into different unit panels (1×1m, 1×0.5m, 0.5×0.5m) by a 500T hydraulic press. These panels are connected with bolts and sealing strips to form water tanks of different specifications and forms.

    Product Introduction

    Our company produces galvanized steel plate water tanks using different plates, formed into different unit panels (1×1m, 1×0.5m, 0.5×0.5m) by a 500T hydraulic press, and connected with bolts and sealing strips to form water tanks of different specifications and forms.

    The water tank has advantages such as convenient and flexible on-site assembly,不易变形, strong seismic resistance, corrosion resistance, easy cleaning and long service life.

    The water tank can store both cold and hot water, and is acid-resistant, alkali-resistant, non-permeable, non-leaking, and non-deformable.

    Selection Instructions

    1. When ordering, the Size, pipe connection position, and pipe diameter should be provided.
    2. The water storage temperature should preferably be 4~80℃. If the water storage temperature is higher than this value, it can be proposed during ordering, and a separate solution will be provided.
    3. The load of the water tank on the ground should be determined by the structural designers.
    4. If the water tank pipe connection position provided by the user is exactly at the plate seam, our company needs to adjust it, the pipe diameter remains unchanged (the user will not be notified separately).

    Installation and Acceptance

    1. During installation, a maintenance passage of not less than 700 mm should be left between the tank body and the wall. The top and bottom of the tank should be not less than 500 mm.
    2. During civil construction, prepare the supports first, and the edge seams between the water tank sides and the bottom unit panels should be located on the supports.
    3. After assembly, close the water supply and drain pipes, open the water inlet pipe, and check while releasing water until the tank is full. No leakage within twenty-four hours is considered qualified.

Water tank production equipment


Production equipment
Production equipment

Honors and Qualifications


Business License
Account opening license
Safety Production License
Environmental Management System Certification

Packaging and shipping


Packaging and shipping
Packaging and shipping
Packaging and shipping
Packaging and shipping

FAQ


A
Our company was founded in 1991. Located in Luquan Tun Industrial Park, Wucheng County, the company covers an area of 28,000 square meters, with more than 200 employees. It possesses over 80 sets of advanced large and medium-sized professional production equipment and assembly lines, as well as advanced testing equipment and a performance laboratory.

A
Customers can provide us with their specific requirements, such as size and performance. Our company will then arrange for professionals to communicate, design, and manufacture according to these requirements.

If you are interested in this product, please fill in the following information and submit it to us, and we will arrange for experts to contact you as soon as possible!

Related Products

Related Products